What should I do before the routine inspection of the polyester industrial yarn spinning machine?
Release date: [2018/7/14]  Read total of [1019] times

Before starting the polyester industrial yarn spinning and pulling machine, it is necessary to check whether there are any problems with each component. If there is any problem, it should be processed first to ensure the normal operation afterwards. Just as the aircraft has a series of precision checks before starting, the construction of the polyester industrial yarn spinning and pulling machine is not as complicated as it is not on the plane, but the success of the operation depends on the pre-examination. The following precautions in the operation of the polyester industrial silk spinning combined machine are the highlights. Let's learn together.


1. The transmission part should be running smoothly without abnormal noise.

2. Under normal working conditions, the surface temperature rise of the screw extruder gearbox should not exceed 30 °C. The temperature rise of the metering pump gearbox should not exceed 20 °C.

3. When the ambient temperature is lower than 28 °C, the average temperature of the front and back surfaces of the spinning box insulation layer should not exceed 65 °C.

4. The pipe joints must not leak.

5. The wind speed of the blowing device should be stable, and there is no sharp floating or merging phenomenon in the silk. In the ring blowing device, the wind speed difference rate of the single spinning surface on the same horizontal surface should be no more than 15, and the wind speed difference rate of the single spinning position on the same horizontal surface of the side blowing device should be no more than 20.

6. The tow channel and the tow contact area should be smooth and not hanging.

7. The biphenyl pipeline shall be tested for air tightness according to the values specified in the technical documents and shall not leak.

8. The spinning box should be manufactured, tested and accepted according to GB 150 and supervised by TSG R0004--2009.

9. The temperature difference between the fixed temperature measurement points of the spinning box heated by the heat medium should not exceed 2 °C.

10. The temperature difference between the fixed temperature measuring points of the electrically heated spinning head should not exceed 3 °C.

11. The temperature control accuracy of each area of the screw extruder should be ±2 °C.

12. The precision of the melt pressure control of the screw extruder should be ±0.3 MPa.

13. The metering pump shall comply with the provisions of FZ/T 92026.

14. The spinneret shall comply with the provisions of FZ/T 92038.

15. Electrical equipment and lines are well insulated with insulation resistance ≥1 Mi2.

16. The protective grounding of the metal casing is reliable, and the grounding resistance is ≤0.1 Q.

17. The electrical components shall be able to withstand the withstand voltage test for 1 min. The test voltage is ≥1 500 V. It must be disconnected when testing components that cannot withstand the above high voltage.

18. Spinning machine coating should meet the requirements of FZ/T 90074.


Many people think that when the machine is in normal operation, there is no need to supervise it. Unfortunately, this idea is wrong. First of all, the rules of different industries are different. As far as the textile industry is concerned, when the polyester industrial yarn spinning and pulling machine is running, there are also matters needing attention. The spinning process is a fine work. If the machine is slightly wrong, it will cause mistakes and cause butterfly effect. . Therefore, it is necessary to learn these precautions.